The aluminum formwork manufacturer believes that the aluminum formwork construction process is suitable for the construction of concrete structure walls, horizontal floor slabs, columns, beams, climbing formwork, pipe gallery, etc., and has significant characteristics in the construction method. Compared with the traditional Plywood and steel formwork construction process, it has significant characteristics and novelty in terms of construction period, quality, safety and civilization, economy and environmental protection. The details are as follows (mainly for the construction of residences/examples):
(1) Convenient construction and shortened construction period.
high strength and light weight, with a weight of only 21-25 kg per square meter; convenient construction and simple assembly, aluminum formwork can be completely disassembled and assembled by hand, and all materials are manually transferred vertically, without relying on tower cranes and unloading platforms; high construction efficiency, normal construction can reach a standard layer in five days.
This construction process adopts an early demolding system, and the aluminum formwork support system does not generally require the construction of horizontal rods. The support head of the vertical support rod is combined with the formwork to form a rigid connection, and a portal frame is formed between the support rods. When the formwork is removed, the support system remains, and the support rods are removed after the concrete strength meets the requirements.
(2) Good appearance of concrete.
After the aluminum formwork is removed, the overall appearance is good. Whether in terms of appearance quality, flatness, verticality, cross-sectional dimensions, etc., the qualified rate is almost reached. This is well verified in the actual measurement data, which is also incomparable to traditional formwork such as wooden formwork. According to actual engineering measurements, the flatness of the wall constructed by aluminum formwork can reach the level of (-5,5), which is due to the good strength, rigidity and stability of aluminum alloy formwork.
(3) Safe, civilized and reliable construction.
High bearing capacity, up to 30KN-40KN per square meter (test load up to 60KN); less waste on site construction, simple support system. All parts of the aluminum formwork system can be reused. After the construction and demolding, there is no waste on site. The support system structure is simple and easy to remove, so the entire construction environment is safe, clean and tidy. Moreover, the formwork of the next layer is directly transferred to the construction of the upper layer, and the handling of turnover materials is convenient.
(4) Economic and environmentally friendly.
It has a long service life, high turnover rate, and low unit cost. Theoretically, it can be used more than 300 times under standard construction. The price cost is lower than that of traditional wood and bamboo formwork; it has high recycling value. Architectural aluminum formwork manufacturers believe that aluminum formwork is a new type of green and environmentally friendly building material. Even after being used more than 100 times, its aluminum can be recovered and recycled without polluting the environment.
CIEZN TECH Aluminum Formwork has an annual production area of over 5 million square meters and an annual shipment volume of nearly 1,000 units. It has a brand-new aluminum formwork casting and extrusion production line, with a FLAT TIE and TIE ROD dual system operation. The formwork can be rented, sold, replaced, and recycled.
FOR BUSINESS OPPORATION, PLEASE CONTACT US VIA:
Email: aluformwork@ciezn.com
whatsapp: +8605387572007
Phone: +8618873103320
Email: aluform@ciezn.com
WhatsApp: +8618873103320
Address:11th floor, building 4, gaoshengxingguan office building, xiangfu road, yuhua district, Changsha, Hunan.