FOB Price: $100 USD/SQM - 120 USD/SQM
MOQ: 100 SQM
Delivery Time: within 10 days
Supply Ability: 60000000 SQM/YEAR
Loading Port: Shenzhen Port
Payment Terms: T/T, L/C
Aluminium formwork is mainly used to solve the formwork construction of the cast-in-place main structure of housing construction. It can shorten the construction period and finished concrete structure does not need plastering. Construction with CIEZN aluminium formwork, the construction speed can reach 4 days per floor.
Panel System
Standard and irregular panels are used to guarantee the production of solid structured concrete.
Supporting System
Support system includes various types of posts/props catering to all kinds of roofs, beams, and cantilevered structures, to ensure panels on position solidly.
Connection System
Wedge and pins are used to ensure total integrity in interlocking panels. Flat ties are used to ensure wall thickness
Reinforcement System
Square or rectangular hollow reinforcement waler to prevent over-loading and to guarantee dimensional accuracy.
Using CIEZN aluminum formwork, all structural building components can be cast in concrete in a single operation that dramatically reduces construction times and results in an extremely strong and high quality concrete structure.
The formwork is custom designed and made-to-measure for each project and is able to monolithically form all components at the same time including
Aluminium formwork application space is constantly increasing: such as small high-rise, medium and low-rise, basements, public buildings, complex structures, road auxiliary structures, pipe gallery projects, etc.
Construction with CIEZN aluminium formwork achieves with a high quality finish, finished concrete structure does not need plastering.
Characteristics |
Steel formwork |
Plastic formwork |
Timber formwork |
Aluminum formwork |
Low dependence on equipment |
|
√ |
|
√ |
Form staircase with accurate dimensions for riser and thread |
|
|
|
√ |
High strength & bearing capacity |
√ |
|
|
√ |
Suitable for high-rise buildings |
|
|
|
√ |
Dismantle slab panels without moving props |
|
|
|
√ |
Excellent concrete surface quality without plastering |
√ |
|
|
√ |
Easy to combine with other types of formwork |
|
|
√ |
√ |
Recycle utilization, less average cost |
|
|
|
√ |
High speed of construction, save time cost |
|
√ |
|
√ |
Environment-friendly, no construction waste |
√ |
|
|
√ |
characteristics | Aluminum Frameworks | Timber Formworks | Difference |
Amortization | 3.73 | 14.4 | -10.67 |
Labour Cost | 20 | 25 | -5 |
Cost of Secondary Patching | No Secondary Patching | 16 | -16 |
Waste Disposal Fee | No waste | 2 | -2 |
Total | 23.73 | 57.4 | -33.67 |
Unit: RMB/m²
Remarks:
Aluminum Formworks amortization: Divided by 300 after deducting the recycle value
Timber Formworks amortization: Divided by 10
The total price difference is about 4.5 USD/m²
Phone: +8618873103320
Email: aluform@ciezn.com
WhatsApp: +8618873103320
Address:11th floor, building 4, gaoshengxingguan office building, xiangfu road, yuhua district, Changsha, Hunan.