products
Home » Products »Comprehensive Aluminium Formwork System
Comprehensive Aluminium Formwork System
Comprehensive Aluminium Formwork System
Comprehensive Aluminium Formwork System
Comprehensive Aluminium Formwork System
Comprehensive Aluminium Formwork System
Comprehensive Aluminium Formwork System
Comprehensive Aluminium Formwork System
Comprehensive Aluminium Formwork System
Comprehensive Aluminium Formwork System

FOB Price: $100 USD/SQM - 120 USD/SQM

MOQ: 100 SQM

Delivery Time: within 10 days

Supply Ability: 60000000 SQM/YEAR

Loading Port: Shenzhen Port

Payment Terms: T/T, L/C

 

Contact us
Description

Aluminium formwork System

 

 

Aluminium formwork is mainly used to solve the formwork construction of the cast-in-place main structure of housing construction. It has the advantage of shortening the construction period and exempting the need for plastering on the structure. The use of aluminium formwork can complete the pouring construction of one floor in 3 to 5 days.

CIEZN aluminium formwork system is suitable for constructing typical floors, podiums and basement structures of residential construction projects such as high-rise residential apartments, office buildings, hotels, terrace houses, etc. It can also be used for part of the structure of public construction projects such as bridges, tunnels, pipe galleries, railways, etc.

 

 

• Flat-Tie + Hollow Section + Aluminium Formwork + Steel Accessories

 

 

The features of flat-tie system: The aluminium formwork reinforcement system of flat-tie type has lighter accessories in weight. It has smaller gaps for the distances between raking shores, which makes it more flexible for precision adjustments and more convenient for verticality control. Therefore, the casting result of the concrete wall using flat-tie reinforcement formwork system has better verticality. There are no obvious holes left in the concrete wall upon the dismantlement of the formwork system with embedded flat-ties, as the 2 edges of the flat-tie will be cut by using particular tools. Therefore, the cost for hole filling afterward can be saved up, while the waterproof construction quality for the wall body is more guaranteed.

 

 

 

Materials for wall and column formworks with embedded flat-ties: Materials for wall and column formworks with reusable flat-ties:
▪ Embedded flat-ties
▪ Aluminium alloy wall panels with grooves at their edges
▪ Hookies
▪ Hollow sections
▪ Flat-tie raking shores
▪ Pins and wedges
▪ Reusable flat-ties
▪ Flat-tie sleeves
▪ Aluminium alloy wall panels with grooves at their edges
▪ Hookies
▪ Hollow sections
▪ Flat-tie raking shores
▪ Pins and wedges

 

 

• Tie-Rods + Walers + Aluminium Formwork + Steel Accessories

 

 

 

The features of the tie-rod system: 

The main components of the tie-rod reinforcement system in aluminium formwork system are tension tie-rods, walers, and raking shores. The functions of these components are integrated to guarantee the strength, durability, and stability of the system. Upon the completion of the tension tie-rod and waler reinforcement, the stability of the overall wall body will become stronger. After the tie-rod formwork system is dismantled, many tie-rod holes will be left in the wall body, where special waterproofing measures should be done to the tie-rod hole positions.

Competitive Advantages

 

 
 
 
 

 

Integrated Product Solutions

 

 

 

CIEZN offers one-stop package solutions for its product and service offerings. Products in CIEZN's one-stop package include the podium formwork system, the basement formwork system, the typical floor formwork system, the roofing formwork system and the self-climbing platform.

 

 

For more details, please send us an enquiry below derectly.

SEND INQUIRY NOW
CONTACT US

Phone: +8618873103320

WhatsApp: +8618873103320

Address:11th floor, building 4, gaoshengxingguan office building, xiangfu road, yuhua district, Changsha, Hunan.

CONTACT US
Receive exclusive offers and news!