FOB Price: $100 USD/SQM - 120 USD/SQM
MOQ: 100 SQM
Delivery Time: within 10 days
Supply Ability: 60000000 SQM/YEAR
Loading Port: Shenzhen Port
Payment Terms: T/T, L/C
Aluminium formwork is mainly used to solve the formwork construction of the cast-in-place main structure of housing construction. It can shorten the construction period and finished concrete structure does not need plastering. Construction with CIEZN aluminium formwork, the construction speed can reach 4 days per floor.
Panel System Standard and irregular panels are used to guarantee the production of solid structured concrete.
|
|
Supporting System
Support system includes various types of posts/props catering to all kinds of roofs, beams, and cantilevered structures, to ensure panels on position solidly. |
Connection System Wedge and pins are used to ensure total integrity in interlocking panels. Flat ties are used to ensure wall thickness
|
|
Reinforcement System Square or rectangular hollow reinforcement waler to prevent over-loading and to guarantee dimensional accuracy. |
Using CIEZN aluminum formwork, all structural building components can be cast in concrete in a single operation that dramatically reduces construction times and results in an extremely strong and high quality concrete structure.
The formwork is custom designed and made-to-measure for each project and is able to monolithically form all components at the same time including
Aluminium formwork application space is constantly increasing: such as small high-rise, medium and low-rise, basements, public buildings, complex structures, road auxiliary structures, pipe gallery projects, etc.
Construction with CIEZN aluminium formwork achieves with a high quality finish, finished concrete structure does not need plastering.
Characteristics |
Steel formwork |
Plastic formwork |
Timber formwork |
Aluminum formwork |
Low dependence on equipment |
|
√ |
|
√ |
Form staircase with accurate dimensions for riser and thread |
|
|
|
√ |
High strength & bearing capacity |
√ |
|
|
√ |
Suitable for high-rise buildings |
|
|
|
√ |
Dismantle slab panels without moving props |
|
|
|
√ |
Excellent concrete surface quality without plastering |
√ |
|
|
√ |
Easy to combine with other types of formwork |
|
|
√ |
√ |
Recycle utilization, less average cost |
|
|
|
√ |
High speed of construction, save time cost |
|
√ |
|
√ |
Environment-friendly, no construction waste |
√ |
|
|
√ |
characteristics |
Aluminum Frameworks |
Timber Formworks |
Difference |
Amotization |
3.73 |
14.4 |
-10.67 |
Labour Cost |
20 |
25 |
-5 |
Cost of Secondary Patching |
No Secondary Patching |
16 |
-16 |
Waste Disposal Fee |
No waste |
2 |
-2 |
Total |
23.73 |
57.4 |
-33.67 |
Unit: RMB/m²
Remarks:
Aluminum Formworks amotization: Divided by 300 after deducting the recycle value
Timber Formworks amotization: Divided by 10
The total price difference is about 4.5 USD/m²